
Vibe Coding: Convert Excel apps to web apps. No code required.

Michael
June 12, 2025
Everyone is discussing AI and “vibe coding,” but what exactly are they? At Peerigon, we utilize AI to work more efficiently, and vibe coding is part of our toolbox. In this blog post, we will use a real-life example to demonstrate what can be achieved with it and where its limitations lie. Join us for a vibe coding experiment 🚀
⚡ TL;DR
- What is vibe coding? AI writes code based on natural language instructions.
- Is vibe coding an alternative to traditional software development? No! It is an additional tool that you need to know how to use. However, it can be very helpful as a supplement and significantly reduce development time.
- How well does it really work: It works well for prototypes and smaller applications, but has clear limitations
- Our experiment: Excel tool → web app in several iterations
- Conclusion: A helpful tool for certain use cases, but very limited without engineering experience and to be used with caution
📚 Definition
Vibe coding was coined in February 2025 by Andrej Karpathy, co-founder of OpenAI and former head of AI at Tesla. His definition from the original tweet from February 3, 2025:
Karpathy describes it as follows: “I build a project or a web app, but it's not really programming — I just see things, say things, do things, and copy things, and it mostly works.”
An interesting comparison is Rick Rubin, the legendary music producer. In a CBS 60 Minutes interview from January 2023, the nine-time Grammy winner said: “I have no technical skills and I know nothing about music.” Nevertheless, he successfully produces hits for artists ranging from Jay-Z to Johnny Cash. He is paid for his taste and communication skills, not for technical know-how.
🔀 Distinction
With all these possibilities, there are also clear limits. It is important to understand that the boundaries are fluid and the decisive difference often lies in the person operating the AI, not in the tool itself.
🎯 Vibe Coding (trust without understanding):
- Complete trust in AI without code review
- “Forget that the code even exists” (Andrej Karpathy)
- Functionality-oriented: The main thing is that it works
⚙️ AI-assisted development (AI as a tool):
- Humans and AI work together
- Code must be explainable and maintainable
- Quality processes remain in place
👨💻 Traditional development (manual):
- Code is written entirely by hand
- Classic review and testing processes
The decisive factor: An experienced developer who uses Claude for rapid prototyping is likely to be doing AI-assisted development, even if they say they are doing “vibe coding.” A non-techie who builds a complex app with the same AI is doing real vibe coding—with all the risks that entails.
As Simon Willison aptly puts it: “If an LLM wrote the code for you, and you then reviewed it, tested it thoroughly and made sure you could explain how it works to someone else—that's not vibe coding, it's software development.”
⚠️ Important: Never use your vibe coding product for business-critical purposes without testing it first.
🛠️ Tooling: What vibe coding works with
Basically, any modern LLM is suitable for vibe coding. The most important differences lie in user-friendliness and available features.
🤖 Basic LLMs
All of these tools have the ability to execute and display code directly. In OpenAI, Mistral, and Google, this is called Canvas, and in Antropic, it is called Artifacts. There are also sharing features to share applications within a team, which vary depending on the type of subscription.
🚀 Specialized vibe coding tools
👨💻 Tools for Engineers
Editors
Terminal tools
- Anthropic Claude Code
- OpenAI Codex
- Google Gemini CLI
Conclusion: Basic LLMs are sufficient for beginners. For serious development → specialized tools, but then it's more like AI-assisted development. Enough of the dry theory. Now let's get started and finally “vibe.”
In our example, we use Antropic Claude, as we have had good experiences with it. Antropic's models (Opus and Sonnett) are well known in the AI dev community as very good coding models. In addition, the results can be published directly via Claude Artifacts and thus shared.
💻 Hands on: Our own estimation template
From Excel sheet to web app (without writing a single line of code)
No one likes to do it, but it's necessary: we're talking about estimates. For years, we've been using a small Excel sheet to break projects down into logical chunks that we then estimate as a team.
The logic is straightforward and therefore easy to map in Excel:
- Each task is estimated with a worst case, likely case, and best case.
- The PERT score is calculated as (worst + (likely x 4) + best) / 6.
However, the details are irrelevant for our example.
💡 Pro tip: If you use a super complicated Excel sheet and don't know 100% how it works because it has grown over years in your company, AI can help you explain it.
🏄 Let's do some vibe coding
🔍 Analysis phase

That's the first prompt. After about two minutes and lots of analysis loops by the AI, the first analysis comes at the end:

🤖 Claude analyzes:
## Estimation Template Structure
The template consists of 4 sheets:
### 1. **Project Sheet**
- Basic project metadata (name, customer, estimator, date)
- List of assumptions that the estimation is based on
### 2. **Checklist Sheet**
- Quality assurance checklist to ensure good estimation practices
- Questions about assumptions validation, task decomposition, and estimation methodology
### 3. **Toolbox Sheet**
- Reference material about cognitive biases in estimation
- Links to resources about anchoring, optimism bias, etc.
- Best practices for estimation
### 4. **Estimation Sheet** (Main functionality)
This is where the actual calculations happen using the **PERT (Program Evaluation and Review Technique)** methodology.
## How the Estimation Works
### Input Structure:
- **Categories**: The template has predefined categories like:
- Setup
- Testing
- Mock Data
- Application Features
- CI/CD Pipeline
- Meetings/Communication (15% buffer)
- Bugfixing (10% buffer)
- Documentation
- Releases and Deployment
- Issue Management and Reviews (5% buffer)
- Testing Support
- UNKNOWNS (10% buffer)
### For each task:
- **Description** (Column C)
- **Best Case hours** (Column D)
- **Most Likely Case hours** (Column E)
- **Worst Case hours** (Column F)
### Calculations:
1. **PERT Score** (Column G): `(Best + 4×MostLikely + Worst) / 6`
2. **Sigma** (Column H): `(Worst - Best) / 6`
3. **Variance** (Column I): `Sigma²`
4. **Days per category** (Column J): Proportional distribution based on variance
5. **Rounded days** (Column K): Rounded to 0.5 day increments
### Final Calculations:
1. Sum all direct task estimates
2. Add percentage-based buffers:
- Meetings/Communication: +15%
- Bugfixing: +10%
- Issue Management: +5%
- Unknowns: +10%
3. Calculate standard deviation
4. Provide probability-based estimates:
- 50% confidence (median)
- 68% confidence (1 standard deviation)
- 95% confidence (2 standard deviations)
- 99.7% confidence (3 standard deviations)
## Key Features for Web App Conversion:
1. **Dynamic task rows** per category
2. **Automatic PERT calculations**
3. **Configurable percentage buffers**
4. **Real-time probability calculations**
5. **Project metadata storage**
6. **Checklist validation**
7. **Export/import functionality**
8. **Visual presentation of confidence levels**
The web app should maintain this calculation logic while providing a more user-friendly interface for entering estimates and viewing results.
✅ This describes the functionality of the Excel sheet very well.
📎 Design phase
We extracted the requirements and even received a proposal for the features of the web app:
## Key Features for Web App Conversion:
1. **Dynamic task rows** per category
2. **Automatic PERT calculations**
3. **Configurable percentage buffers**
4. **Real-time probability calculations**
5. **Project metadata storage**
6. **Checklist validation**
7. **Export/import functionality**
8. **Visual presentation of confidence levels**
The web app should maintain this calculation logic while providing a more user-friendly interface for entering estimates and viewing results.
That sounds good! Now I'd like to see a clickable prototype (without implementing the entire logic):

And just like that, HTML and CSS are generated. Since I didn't specify otherwise, it's classic HTML without frameworks and everything in one file.
▶️ V1: Click dummy

It doesn't look bad, and we get immediate feedback on how to proceed:
I've created a mockup of how the Excel estimation tool could look as a modern web application. Here are the key features I've included:
## Design Highlights:
1. **Modern UI**: Clean, professional interface with a gradient header and card-based layout
2. **Tab Navigation**: Four main sections matching the Excel sheets:
- Project Info
- Estimation
- Summary
- Checklist
3. **Interactive Features**:
- Dynamic task addition with “Add Task” buttons
- Real-time PERT calculation as you type
- Visual percentage badges for buffer categories
- Checkbox interactions in the checklist
-
1. **Visual Improvements**:
- Color-coded confidence levels
- Summary statistics in an easy-to-read grid
- Hover effects and smooth transitions
- Responsive design that works on different screen sizes
2. **Key Functionality Preserved**:
- PERT methodology (Best/Most Likely/Worst case)
- Automatic percentage-based categories
- Confidence level calculations
- Quality checklist
- Export options
The mockup demonstrates how the Excel functionality can be enhanced with:
- Better visual hierarchy
- Easier data entry
- Real-time calculations
- More intuitive navigation
- Modern, professional appearance
This is a static mockup, but in a real implementation, you would add:
- Backend data persistence
- Full calculation engine
- Project management features
- User authentication
- Team collaboration
- Export to Excel/PDF functionality
- Data visualization charts
Would you like me to expand on any particular aspect or show additional features?
🛠️ Implementation phase?
And now exactly what we often experience in our workshops is happening: Although the requirements seemed very clear in advance, a small idea is turning into something huge. That's not a bad thing, though, as it helps us understand the vision behind the idea and get a clear picture of where the journey could take us.
The following part is particularly interesting:
This is a static mockup, but in a real implementation, you would add:
- Backend data persistence
- Full calculation engine
- Project management features
- User authentication
- Team collaboration
- Export to Excel/PDF functionality
- Data visualization charts
I would like all of that for our estimation tool, but it makes the project far too complex in its current phase.
🚨 It is important at this point to get on the right track and not let AI build you a jack-of-all-trades (small spoiler: it's not very good at that).
⏪ REWIND: Our initial idea was to convert the Excel sheet into a web application. Topics such as user authentication, team collaboration, charts, and import/export weren't part of the plan before, were they? The Excel sheet was stored somewhere in the cloud as a template and anyone with access could access it. Of course, it would be obvious to tackle these issues in order to create real added value, but that makes the project many times more complex...
Another question arises: Where should the application ultimately run? Is the person writing the prompt able to deploy the application independently and securely?
For anyone who cannot answer “yes” to this question within two seconds, I recommend sticking with a static website and publishing it via Claude Artifacts or ChatGPT Canvas, for example.
That's what we plan to do in this case, so we give the AI the following input:

And Claude doesn't just make a suggestion, it jumps right into implementation.
🤖 Let me create a more practical, minimal version that could be deployed immediately: I've created a minimal, fully functional version that requires zero backend engineering and can be deployed as a static file.
🔁 Refinement: Multiple iterations until the goal is reached
After a few minutes, we get the first functional version, which we refine bit by bit. The more specific the requirements in the prompt, the better the result usually is. I deliberately kept the wording concise and let myself be guided by the vibe coding style. However, this also means more guesswork and therefore more correction loops.
▶️ V2: No tabs, an error message, and chaotic buttons

It doesn't look bad, but there are three problems in the details:
1. Error message
🐛 Unfortunately, the application throws a security error in the browser that has to do with accessing localStorage in the sandbox (Claude Artifacts). If you open the file locally or deliver it via a static web server, you should not get the error.
🏓 But even if you don't know exactly what that means, you can just throw the error back to the AI. That's the beauty of vibe coding ;)
2. No tabs
Although the tabs were visible in the click dummy, everything ended up on one page in the first functional version.
3. Chaos buttons
The buttons for the actions “Save,” “Load,” etc. are not aligned properly.

💪 Let's fix it!
With strict vibe coding, you ignore the code that has been created and focus entirely on the prompt. Therefore, we want to fix the errors one by one:

▶️ V3: No tabs, an error message and chaotic buttons

✅ The error message is gone. Tabs and buttons are not fixed yet, but that wasn't our explicit request. So let's move on...

▶️ V4: Tabs, but buttons are still chaotic (and don't work)

✅ Perfect! The tabs are there and the error message is still gone.
Now let's take a look at the problem with the buttons: On closer inspection, it becomes apparent that the buttons are not only overlapping but are actually not working properly. Classic AI coding experience! In our case, the buttons did not work from the start. But “making things worse” or accidentally “breaking” existing functionality in the course of expanding an application is a very common phenomenon at viben.

▶️ V5: chaotic buttons (that don't work)

The buttons are now neatly arranged in a row and are supposed to work. Unfortunately, they don't in reality, but that's also due to how the application is delivered via Claude Artifacts.
To be fair: These would work in a local environment, and Antropic has since instructed its AI to no longer use these local APIs, as they don't work in the sandbox.

Claude was very confident that the problem had been solved. That's why we want to try another iteration.

▶️ V5: As good as it gets (80%)
You have to give Claude credit for coming up with a very creative solution that works within the limitations of the sandbox. The manual copying method is not elegant, but it is better than no import/export at all.

Finally, we have a working version with a somewhat complicated import/export process. We could spend hours tweaking it, but for our example, we'll leave it at that.
🔍 Technical analysis: What did the AI actually build?
Before we come to our conclusion, let's take a look under the hood.
📊 Facts:
- 918 lines of code in a single HTML file
- ~380 lines of CSS (47.7%)
- ~310 lines of JavaScript (38.9%)
- ~106 lines of HTML (13.3%)
- Zero dependencies - no external dependencies
✅ The good:
- Full feature set with PERT calculations, import/export, and sharing
- Clean, modern UI with responsive design
- Extremely portable—open the HTML file and it works
- PERT calculations are implemented correctly
⚠️ The bad:
- Security vulnerabilities: XSS vulnerabilities due to insecure innerHTML
- Code chaos: Everything in global scope, inline event handlers, no modularization
- No validation: Best case could be bigger than worst case
- Hardcoded assumptions: 8-hour days, 40% buffer
- Maintainability: No tests, no documentation, everything in one file
It is a functional tool that serves its purpose, but suffers from typical ‘proof of concept’ problems: security vulnerabilities, poor code organization, and limited maintainability.
What does this mean for VibeCoding?
This example perfectly illustrates the strengths and weaknesses of VibeCoding:
- Strength: From idea to working prototype in just a few minutes
- Weakness: The code is a classic “it works, but...” example
For internal tools or prototypes, this may be perfectly adequate. For production use with multiple users or sensitive data? Definitely have someone with engineering experience take a look.
🎬 Wrapping up
We hope this hands-on Vibe Coding example has shown you what the term means. In our example, we used Antropic Claude (desktop) and published the “app” via Artifacts. Vibe Coding also works with ChatGPT and AI tools designed specifically for developers, such as Cursor, GitHub Copilot Agent, and Claude Code.
However, we deliberately limited ourselves to a non-techie setup, as vibe coding is often touted as a replacement for developers. Those with an engineering background can use vibe coding to build and publish much more complex applications. The difficulty here, however, lies in ensuring code quality and security with many, many lines of automatically generated code (which no human would want to review).
💪 What VibeCoding can really do (and what it can't)
👤 For non-developers
✅ Realistic use cases
- Single-user productivity tools:
- 🧮 Personal cost calculators
- 📈 Data analysis tools
- 📊 Personal dashboards
- Data processing:
- 🔄 Format converters
- 🧹 Data cleaning tools
- 📝 Report generators
- Design utilities:
- 🎨 Color palette generators
- ✏️ Typography testers
- 🖼️ Interactive mockups
- Explorative prototyping:
- 🧠 Validate/brainstorm/visualize concepts
- 🎨 Develop UIs for later discussions with UI/UX and dev teams
❌ The limits quickly become apparent
As soon as more than one person needs to use the tool or data needs to be stored, things get complicated:
- 👥 Multi-user applications (shared data required)
- 🔐 Anything with authentication
- 📧 Tools with email delivery
- 💾 Cross-session storage between users
Most “cool” app ideas require servers, databases, or APIs that VibeCoding (without an engineer) cannot provide.
👨💻 For developers
Advanced options: Vibe Coding can certainly create more complex front-end applications, but anything beyond static single-page apps requires special tools, an engineer in the loop, and then it's usually no longer Vibe coding.
Sweet spot: Rapid prototyping and proof-of-concepts, not production-ready code. With engineering tools such as Cursor, Claude Code, or GitHub Copilot, you can get much further than with pure browser Vibe Coding.
The challenge: Ensuring code quality and security with many lines of automatically generated code that no one wants to review.
🔑 The key difference
VibeCoding works best for self-contained applications. As soon as the following components are required, it becomes exponentially more complex:
- 🗄️ Databases (beyond LocalStorage/IndexedDB)
- 🔐 User authentication & session management
- 📧 Email delivery & notifications
- 📤 File upload & server processing
- 👥 Multi-user functions
- 🔌 API integration with error handling
🫣 The dark side: When code becomes “fast fashion”
Vibe Coding democratizes app development – but at what price? As with fast fashion, there is a risk of a throwaway mentality.
The “fast apps” problem:
- Code garbage: Thousands of unmaintained single-use apps clog up servers and repositories
- Technical debt: Quick & dirty code that “works for now” but creates problems in the long run
- Security gaps: Unpatched apps with known vulnerabilities become gateways
- Waste of resources: Redundant solutions for problems that have already been solved and high energy consumption through the use of LLMs.
A real-world example: Imagine every department builds its own estimation tool. In the end, you have:
- 10 different versions with similar functionality
- None of them are maintained or updated
- Each has its own security vulnerabilities
- No one knows which version is “the right one” anymore
In addition, LLMs require vast amounts of electricity and water, both during training and operation. If you want to delve deeper into this topic, I recommend the recently published [study by the German Informatics Society]((https://gi.de/meldung/gi-veroeffentlicht-studie-zum-wasserverbrauch-von-ki).
🌿 Sustainable coding: The conscious use of AI tools
🤔 The problem is not the technology – it's how we use it. Just like with fast fashion, it's about conscious consumption vs. thoughtless production.
✅ Our sustainable principles:
- “Build to learn, not to launch:” Prototypes as learning tools, not end products
- “One tool, well maintained:” Better one well-maintained tool than ten forgotten ones
- “Document or delete:” Code without documentation has an expiration date
- “Security first:” Even prototypes can cause damage
At Peerigon, we use the entire spectrum—but consciously and purposefully:
- Vibe Coding → Concept validation, workshops, experiments (with an expiration date!)
- AI-Assisted Development → Productive apps with an AI boost and professional quality processes
- Traditional Development → Critical systems where every line must be checked
🤝 Pro tip: The perfect handoff
Your prototype is proving itself? AI helps with the next step:
This is how a quick idea becomes a sustainable solution – with the right tool at the right time.

🤖 Statement on the use of AI in this article: This blogpost was written by humans (thanks for the feedback Philipp and Lisa!), including the title, concepts, and code examples. However, we used AI for research and to improve the writing style.

🤝 Team up!
Could your project benefit from a creative yet structured development approach? If so, get in touch!
Vibe-coding
AI
AI-assisted-development
Prototyping
Read also

Michael H., 09/22/2026
Vue 3.6: Vapor Mode Makes It the Fastest Vue Yet
Vapor Mode
Vue 3.6
Signals
Reactivity
Frontend Performance
Bundle Size

Philipp, 07/29/2026
Dein Prototyp war fast gratis. Was kostet der Weg in Produktion?
KI Engineering
Vibe Coding
Prototyp
Softwarekosten
Produktionsreife

Nick, 05/27/2026
Frontend Performance Meets Green Coding
Green Coding
Green IT
Carbon Footprint
Sustainability
Energy Tracking
Cloud Efficiency
Web Performance